Board letter for data centre and power plant use.
Every item below carries a status and a date. Tap any row for what it means and which document sits behind it. Two filings go in December 2026; the campus is fully entitled by Q1 2027.
Status, date, document. Nothing else.
One contiguous parcel with a 200-foot evergreen buffer, outside the floodplain, with the plant and the halls on the same title. No assemblage risk, no third-party consent in the path.
DocumentParcel deed & option · surveyThe Zoning and Planning Board has issued a signed letter confirming data centre use and power plant use on the parcel. Both uses, one document, one jurisdiction.
DocumentBoard letter · 24 June 2026Use sits under the zoning board's jurisdiction, and there is no township zoning ordinance to amend or rezone against. The approved use is on the record.
DocumentJurisdiction memo · solicitor opinionAn executed tap on a 20-inch transmission pipeline that crosses the parcel. Fuel does not depend on a new lateral, a new right-of-way, or a third-party compressor upgrade.
DocumentTap agreement · February 2026A 230 kV PENELEC line crosses the property with right-of-way confirmed. It carries the surplus-to-PJM option and station service — it is not in the path of your load.
DocumentRight-of-way exhibit · January 2026The application is being prepared for submission in December 2026, covering nine LM2500+G4 machines on a minor-source pathway with the modelling already run. Emission inventory and dispersion modelling are complete.
DocumentPre-application record · modelling setSubmitted together with the air permit in December 2026. The site plan set is at 60% with stormwater, grading and the eight hall pads laid out.
DocumentSite plan L-1.1 · 60% setWith both filings in December 2026, the review calendar lands on full entitlement in the first quarter of 2027. There is no township clock and no rezone to wait on — the county review window is the only one.
DocumentEntitlement scheduleClosed-loop cooling with no evaporative towers and zero process water — the design removes the water permit from the critical path entirely. Two fibre carriers are on route with diversity into Scranton and Harrisburg.
DocumentUtility letters · carrier routesStatus as of 5 November 2026 · documents available under NDA
Scroll to draw the plan. Toggle the power and gas layers to see what is already at the fence.
L-1.1 · preliminary site plan · 8 equal halls · not for construction
Propagation from 41.78°N, 76.50°W. Design model — not a measured SLA.
Toggle to the conservative method (1.15 route factor, 5% slack) to match the figures published on the current site.
Air permit and land development go in together in December 2026.
Board letter for data centre and power plant use.
Air permit and land development, same month.
Construction-ready, no township clock.
DC-01 energised from the on-parcel plant.
Open under a mutual NDA. Request access and we countersign the same day.