Nine GE Vernova LM2500+G4 machines inside the fence. The plant serves the halls directly, not through a wholesale market.
412 megawatts behind the meter, on 84.62 acres, with gas and 230 kV already on the parcel. Eight equal halls. No interconnection queue in the critical path.
The difference is six years. A new data centre in PJM territory is looking at a network upgrade study that runs to 2030 and beyond. Behind the meter, the wire is already there.
Nine GE Vernova LM2500+G4 machines inside the fence. The plant serves the halls directly, not through a wholesale market.
Gas is on the property. 230 kV crosses the parcel. There is no new transmission line, no cluster study, no upgrade cost to underwrite.
What the halls do not take can go to the grid — an upside option, never a dependency. Your load never rides on the market.
A single-line view of the campus. Tap replay to watch it energise.
Each one is a document. None of them is an adjective.
Eight equal halls at 51.5 MW IT each. Drag the slider — the machines spin up as the halls fill.
Model only · 51.5 MW IT per hall · nine machines at 45.8 MW each · not a dispatch commitment
Fibre routes to the six markets that matter, drawn as propagation from the parcel. Design model — not a measured SLA.
Propagation estimate from 41.78°N, 76.50°W with corridor route factors of 1.08–1.16 and 0.03 ms terminal overhead. Toggle to the conservative method (1.15 factor, 5% slack) to match the figures published today.
Two filings in December 2026. Fully entitled by Q1 2027. First hall in 2027.
Board letter signed for data centre and power plant use.
Air permit and land development submitted together.
Construction-ready. No township clock to wait on.
DC-01 energised from the on-parcel plant.
We will come back with the halls that fit, the plant configuration, and the dates you would be entitled. Same day, usually within four hours.